Now they will be equally impressed with our new facility and its resources.” “Prospective engineering students are always shown the Learning Factory during their campus visits and are always very impressed by our students’ work, especially the industry-sponsored projects. He saw the vision for what we needed to become,” says Matthew Parkinson, director of the Learning Factory and professor of engineering design and mechanical engineering. However, our dean understood that while our programming has kept pace with other makerspaces at peer institutions, our facility has not. “The Learning Factory was not originally in the program for these new buildings. The Learning Factory, which pairs students with more than 100 industry sponsors each year, is scheduled to begin prototyping several classes in the new facility in January 2023, with full occupancy targeted for that summer. ![]() It will soon relocate to 103,000 sf in one of two new state-of-the-art academic engineering buildings under construction on the campus, a move that the Learning Factory program director says will help the program continue to compete with the growing number of makerspaces being established throughout the academic marketplace. Gordon Learning Factory on Penn State University’s main campus in State College, Pa., has operated in its original building for more than 30 years with only minimal facility renovations. Considered one of the first and largest university-level makerspace programs in the country, the Bernard M.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |